• Lighting
  • Electrical construction
  • Data networks
  • Maintenance contracting
  • Industrial, office project
  • Restaurant, retail project
  • Installations
  • Emergency service
  • Institutional project
  • Panel changes and upgrades
  • Outlets, circuits and switches
  • Troubleshooting
  • Repairs
  • Testing

The level of experience is the foundation of EverGreen’s pillars of success and it is the basis of our confidence to commit and provide an upstanding service. EverGreen ensures that the customer’s needs are always the number 1 priority. With this, the requirements and regulations for the endorsement of electrical contractor licensure are always met.

Our electrical team consists of qualified electrical engineers and red seal certified electricians with an extensive amount of experience in the field of electrical contracting. Additionally, specialists in lighting and energy solutions are managing projects to provide appropriate consultation and services for each individual project. Thus, Evergreen is able to provide a turn-key solution for a professional experience in any of the listed services.

The overall background of our team allows us to completely indulge in a project with consideration of our customers. Generating a process that will ensure quality and compliance of safety requirements. The outcomes of our previous work is something we are extremely proud of and stringently produce similar solutions to provide such rewarding results.

CONTACT US NOW

Infrared Scanning

Infrared Image, Thermal Imaging Survey, Inspection of Electrical Equipment, Maintenance Testing

​Infrared Scanning of electrical switchgear, distribution systems and mechanical equipment is the most effective and non-disruptive method of finding the following issues: Imbalanced or overloaded circuits; Loose connections; Defective or damaged circuit breakers, switches, fuses and transformers & Damaged switchgear. All these hidden electrical issues can be detected at an early stage before they lead to costly and dangerous equipment failure & operations downtime.

Example – Recommendations based on temperature rise: B

A= temperature rise above 50 degrees Celsius from reference phase = Major discrepancy – Fix immediately
B= temperature rise of 30-50 degrees Celsius from reference phase = Sustained overheating – Fix as soon as possible  
C= temperature rise of 10-30 degrees Celsius from reference phase = Developed overheating – Fix as schedule permits
D= temperature rise of 5-10 degrees Celsius from reference phase = Minor overheating – Fix as time permits / next maintenance

Note= a problem unrelated to heating which should be resolved and may have varying degrees of significance